Construction of a stormwater pump station in ANZAC Drive, Aranui, as part of the CCC Land Drainage Recovery Programme to mitigate the flood risk in the area. The station is designed to drain the future upstream ponds into the Avon river.
Construction of two wastewater pump stations and sewerage lines upgrades on Courtenay Downs subdivision, Kaiapoi, as part of the WDC Earthquake Infrastructure Rebuild.
Upgrade of diverse commercial businesses sewerage by connecting them into the NZ’s biggest vacuum wastewater system in Aranui. The upgrade also included installing inlet manholes and laying new gravity laterals.
Infrastructure rebuild implying the conversion an “all in one well” wastewater station to detach the wet well from the valve chamber, in Wainoni Rd, Avondale.