Conway Lift Station

Client: 

City Care

Consultant: 

SCIRT

Contract value: 

$125,000

Duration: 

Feb 2013 – March 2013

Brief: 

Construct a waste water lift station on the corner of Conway and Lyttelton Streets including all civil, mechanical and electrical works.

Scope: 

  • Temporary works consisting of a sheet piled cofferdam of 4m x 3m with 8m deep FSPIII sheet piles with multistage well point dewatering to allow excavation to 5.3m
  • Earthworks involving bulk excavation 65m3 and subsequent filling of 40m3
  • Structural concrete works for foundations and anti floatation.
  • Reinstatement of the footpath.
  • Installation of concrete wet well and valve chamber structure along with all mechanical pipework and valving.
  • Installation of the electrical control kiosk and all associated electrical works.

Services: 