Flemington (Subdivision) Waste Water Pump Station

Client: 

HEB Construction

Consultant: 

Harrison & Grierson

Duration: 

May 2017 – August 2017

Brief: 

Construction of part of the Flemington subdivision infrastructure to develop housing land in Lincoln.

Scope: 

  • Temporary works consisting of cofferdams 5.6m x 5.6m with 8m deep FSPIII sheet piles with multi-usage well point dewatering to allow excavation to 5.4m deep.
  • Earthworks involving bulk excavation XXm3 and subsequent filling of XXm3
  • Driven timber pile deep foundation and structural concrete works for foundations and anti-floatation cap.
  • Installation of DN1050 inlet manhole, DN2050 concrete wet well, 2.9m x 1.9m valve chamber and DN1200 flow-meter chamber with all mechanical pipework & valving.
  • Installation of the electrical control kiosk and all associated electrical works, including water transducer.
  • Water supply consisting of water meter and RPZ.

Services: 

Share