Client:
Waimakariri District Council
Consultant:
Waimakariri District Council
Contract value:
$64,000
Duration:
April 2017 – May 2017
Brief:
Upgrade of the public stormwater infrastructure to address the flooding issues experienced in the area following the 2014 floods.
Scope:
- Replacement of old drain sumps by bigger hush pits
- Installation of two 1200 x 1200mm manholes
- Replacement of DN250 and DN300 stormwater pipes by DN300 and DN450 lines.
- Reinstatement of footpath, kerb and channel, brick crossing and carriageway sealing.
